close

Architects & Engineers Login

 

Login Area
Case Studies

DocumentsDate added

Order by : Name | Date | Hits | [ Ascendant ]
file icon Union Fenosa Case Studyhot!Tooltip 04/13/2011 Hits: 1241

Office Buildings
Challenge: Energy
Solution: V8s

file icon Cancer Center Case Studyhot!Tooltip 04/08/2011 Hits: 1152

Healthcare
Challenge: IAQ, outdoor odors
Solution: 2" Air Cleaners

Office Buildings/LEED
Challenge: Energy, Maintenance
Solutions: V8s

Airports
Challenge: IAQ, outside odors
Solutions: V-Banks

file icon GE Office Building Case Studyhot!Tooltip 05/16/2011 Hits: 1042

Office Buildings
Challenge: Odor Control
Solution: V-Banks

file icon FAA TRACON Case Studyhot!Tooltip 04/13/2011 Hits: 1041

Airports
Challenge: IAQ, Outdoor odors
Solution: V-Banks

Healthcare
Challenge: Energy, IAQ, Maintenance
Solution: V8s

Office Buildings
Challenge: IAQ
Solution: V-Banks, V8s

K-12/LEED
Challenge: Energy, Maintenance
Solution: V8s

Office Buildings/LEED
Challenge: Energy, IAQ, Maintenance
Solution: V8s

file icon Ellis Hospital Case Studyhot!Tooltip 05/16/2011 Hits: 891

Healthcare
Challenge: IAQ, outdoor odors
Solution: V8s

file icon Hospital Viamed Case Studyhot!Tooltip 06/30/2011 Hits: 864

Healthcare
Challenge: Energy
Solutions: V8s

file icon Sam's Town Casino Case Studyhot!Tooltip 04/13/2011 Hits: 854

Casinos
Challenge: IAQ
Solution: V-Banks

Office Buildings/LEED
Challenge: Energy
Solution: V8s

Office Buildings
Challenge: IAQ
Solutions: V8s, V-Banks

K-12
Challenge: Energy, Reduced Air
Solution: V8s

K-12/Performance Contracting
Challenge: Energy, Reduced Air
Solution: 1" & 2" Panels

DataComm
Challenge: Energy
Solution: V8s

K-12
Challenge: Energy, Reduced Air
Solution: V-Banks

Healthcare
Challenge: IAQ, Outdoor odors
Solution: V-Banks

file icon El Cortez Case Studyhot!Tooltip 07/05/2011 Hits: 654

Casinos
Challenge: IAQ
Solution: Tandems

Healthcare
Challenge: Energy, IAQ
Solution: V-Banks, Panels, G-375

Government
Challenge: IAQ, Energy, Reduced Air
Solutions: V8s

Government
Challenge: Maintenance, Energy
Solution: V-Banks

file icon Lehigh Phoenix Case Studyhot!Tooltip 08/29/2012 Hits: 458

Manufacturing
Challenge: Filter Maintenance
Solutions: V8s

Healthcare
Challenge: IAQ
Solution: 2" Tandems

Casinos
Challenge:IAQ, Energy
Solution: V-Banks

Office Buildings/LEED
Challenge: Energy
Solution: V8s

Healthcare
Challenge: IAQ
Solution: V8s

file icon WL Gore Case Studyhot!Tooltip 03/04/2013 Hits: 194

WL Gore Electronic Products Facility
IAQ Challenge: Outdoor Air
Solution: Dynamic V8s

file icon Dana Farber Cancer Institutehot!Tooltip 02/13/2013 Hits: 180

Healthcare
Challenge: Energy (LEED)
Solution: Dynamic V8s


file icon ADO GL Luxury Coacheshot!Tooltip 02/14/2013 Hits: 177

Transportation
IAQ Challenge: Superior IAQ
Solution: 1" Air Cleaners

Hanover High School
Energy Challenge: Sustainable Design
Solution: Dynamic V8s

file icon Churchill Downs Case Studyhot!Tooltip 02/18/2013 Hits: 151

Sports Facilities
Challenge: IAQ
Solution: Dynamic V-Banks

file icon Alta Diagonal Case StudyTooltip 04/01/2013 Hits: 81

Office Buildings
Challenge: Energy / LEED Design
Solution: Dynamic V8s


Museums
Challenge: IAQ, Sustainable Design
Solutions: V8s and Activated Carbon Matrix